Project Backgroud

ExxonMobil has started oil production at Liza Phase 2 on the Stabroek block offshore Guyana.
This is the country’s second offshore oil development. This brings total production capacity to more than 340,000 b/d in seven years since the country’s first discovery.Production at the FPSO Liza Unity is expected to reach its target of 220,000 b/d of oil later this year. It adds to the more than 120,000 b/d of capacity at the FPSO Liza Destiny, which began production in December 2019 and is now delivering at better than design capacity.

affco liza-2
affco Liza-2 Butterfly Valve

Scope of Supply

During this project, AFFCO successfully supplied batch of CL150 Bronze ASTM B148 C95500 ,Super Duplex Gr.5A ,Duplex Gr.4A & Cast Steel concentric & double eccentric butterfly valves from DN100~600.

For FPSO scope of supply, AFFCO manufactured and supplied all valves including butterfly valve, ball, Double Block and Bleed (DBB), gate, check, globe in diverse pressure ratings, soft and metal seated, in materials such as Ni Al Br, CS, Stainless Steel.

Butterfly Valve

360

AFFCO Butterfly Valve play a critical role in isolation service across hundreds of installations

Check Valve

S252,255,242

Check Valve in a wide variety of material and specification configurations to suit your application or project

Double block and bleed valve

affco Double_Block_and_Bleed_Valve

AFFCO design and manufacture double block an Bleed Valve (DBB) to satisfy project dimensional requirements.

Relevant Products

For more applications & products for Marine, you can find here.

CASE STUDIES

AFFCO Shanghai will take part in 2023 FFG & MTC

CASE STUDIES

AFFCO Mideast will take part in 2023 NAPEC & WETEX